BRIEF DESCRIPTION

This was a bathroom renovation that made a poorly designed bathroom and bedroom addition work like it was part of the over all design of the home.  The big problem with the addition was that you had to go from the dinning room through the bathroom to get to the bedroom in the rear of the home.  So we closed off the door to the bathroom and built a hallway that took you to the bathroom on the right and the bedroom at the end of the hallway.  We were also able to add a large linen closet and a tub and shower in the bathroom.  The water heater was also moved into the garage to make room for the tub abd shower.  This was the second phase of a whole house renovation.

AT A GLANCE

Project Type Residential
Client Tomball, TX
Completion Date January 2017
MORE PICTURES...
Designed and Developed by Kotchaparn Wongkor